Thermal expansion
Variations in the temperature of a structure can result in thermal movements of its constituent parts. Most building materials will expand with rises in temperature caused (in most cases) by solar heat gains. In many solid materials (i.e not liquids), the expansion will usually be greater along the long dimension of the material as opposed to the short. Liquids tend to expand in all directions when heated.
Different materials are likely to have different rates of thermal expansion. Indeed, it is possible for variations to exist even among samples of the same material. The degree to which solid materials expand as a result of temperature change is expressed by their coefficient of linear thermal expansion (CLTE). The expansion of a material can be calculated from the percentage change in its length per degree of temperature change, its length, and the change in temperature.
Knowing the coefficients of expansion allows designers to calculate how much thermal movement to accommodate (particularly on a hot summer’s day when there are solar heat gains will be higher) by allowing for expansion joints.
Thermal movements tend to be reversible, i.e for every millimetre of expansion, there will usually be the same amount of contraction as the temperature drops.
In the UK, the typical seasonal variations in temperature – i.e between a hot summer’s day and a cold winter’s night – can be as much as 30°C. This can induce strain and damage a building. When materials are restrained excessively and cannot expand, the release of built-up internal stresses can result in cracking, bowing, buckling and other forms of deformation. For example, in brickwork, thermal expansion can cause cracking of both mortar and bricks, allowing rainwater to penetrate through the external leaf.
Long wall panels to low rise buildings such as Bungalows/ single storey masonry structures will "slide" along the DPC. Predominant in structures formed during the 1940's and 1950's, brickwork either end of the wall panel may "overhang" masonry below the DPC.
Expansion joints usually prevent this happening.
In brickwork, 10mm-wide vertical expansion joints filled with a suitable filler material can allow for thermal expansion and are typically installed every 10m-12m for main walling runs. But in freestanding walls and parapets, this is usually reduced to 6m-8m because these constructions are typically more exposed to the elements and have less weight above them (and therefore less restraint).
Thermal expansion in masonry wall panels with large openings or openings that result in a reduced wall panel size locally may exhibit cracks forming as a result of a "stress concentration", particaularly if the elevaiton is south facing.
Movement in the vertical plane should also be considered and accommodated with a horizontal movement joint (sometimes referred to as a ‘soft joint’) at the appropriate spacing.
Lead, zinc and copper can be formed (in roof applications) with traditional ‘drips’ which are steps that break up the length and accommodate thermal expansion. Alternatively, a rubber (neoprene) expansion joint can be used.
Expansion joints are typically filled with a material capable of being compressed by up to around 50% of its original thickness and which can recover after the thermal movement is reversed.
NB AR5 Climate Change 2014: Impacts, Adaptation, and Vulnerability, Glossary, published by the Intergovernmental Panel on Climate Change (IPCC) states in relation to thermal expansion: ‘In connection with sea level, this refers to the increase in volume (and decrease in density) that results from warming water. A warming of the ocean leads to an expansion of the ocean volume and hence an increase in sea level.’
[edit] Related articles on Designing Buildings
Featured articles and news
Twas the site before Christmas...
A rhyme for the industry and a thankyou to our supporters.
Plumbing and heating systems in schools
New apprentice pay rates coming into effect in the new year
Addressing the impact of recent national minimum wage changes.
EBSSA support for the new industry competence structure
The Engineering and Building Services Skills Authority, in working group 2.
Notes from BSRIA Sustainable Futures briefing
From carbon down to the all important customer: Redefining Retrofit for Net Zero Living.
Principal Designer: A New Opportunity for Architects
ACA launches a Principal Designer Register for architects.
A new government plan for housing and nature recovery
Exploring a new housing and infrastructure nature recovery framework.
Leveraging technology to enhance prospects for students
A case study on the significance of the Autodesk Revit certification.
Fundamental Review of Building Regulations Guidance
Announced during commons debate on the Grenfell Inquiry Phase 2 report.
CIAT responds to the updated National Planning Policy Framework
With key changes in the revised NPPF outlined.
Councils and communities highlighted for delivery of common-sense housing in planning overhaul
As government follows up with mandatory housing targets.
CIOB photographic competition final images revealed
Art of Building produces stunning images for another year.
HSE prosecutes company for putting workers at risk
Roofing company fined and its director sentenced.
Strategic restructure to transform industry competence
EBSSA becomes part of a new industry competence structure.
Major overhaul of planning committees proposed by government
Planning decisions set to be fast-tracked to tackle the housing crisis.
Industry Competence Steering Group restructure
ICSG transitions to the Industry Competence Committee (ICC) under the Building Safety Regulator (BSR).
Principal Contractor Competency Certification Scheme
CIOB PCCCS competence framework for Principal Contractors.
The CIAT Principal Designer register
Issues explained via a series of FAQs.